Door Security Device Bid

  1. The Successful Bidder shall provide:
    • 687 Lockout ‘The Boot” Kit devices (no alternate devices accepted)
    • 10 Lockout “The Boot” Spin Keys (no alternate devices accepted)
    • Installation services for 244 (of the 687) Lockout “The Boot” kit devices
  2. The Successful Bidder shall provide all labor, materials, equipment and on-site supervisory oversight necessary for the installation of the 244 devices.
  3. All buildings and furnishings shall be protected by the Successful Bidder from damage which might be done or caused by work performed. Any damage caused directly or indirectly by the Successful Bidder’s agents or suppliers shall be repaired and/or replaced at the expense of the Successful Bidder by methods approved by Midland Public Schools to restore the damaged area(s) to its pre-installation conditions. Midland Public Schools shall deem such repairs acceptable only after inspection and approval.
  4. All new materials shall be asbestos free and installed in accordance with the appropriate manufacturer’s recommendations.
  5. All debris must be removed from the building daily and hauled away after project is complete.
  6. The district will have a dumpster onsite for use by the successful contractor.
  7. The work will be completed at a date no later than August 1st, 2019. Installation is to be completed during days/hours not disruptive to the educational setting.